Ironwood Townhomes
Twelve high-performance townhouses delivered as a single coordinated phased handover.
On budget, on time, on record.
Cost planning, scheduling and reporting throughout construction — full transparency to the owner.
Cost control on a development is more than line-item accounting — it's a live discipline of forecast, variance analysis, change management and trend tracking. We provide a monthly Cost Report covering committed, paid, accrued, forecast and trend, with variance commentary on every line over 2%.
Cost control runs in parallel with construction management for our own projects, and standalone for client-led developments.




A clear, six-stage path from first conversation to handover — tailored for project & cost control.
We walk the site, listen to your goals and constraints, capture measurements, and align on a realistic budget envelope before any drawings are produced.
Architectural and structural detailing, material selection, and 3D coordination — refined with you until every decision is locked in writing.
Detailed line-item estimate, schedule of values and a transparent fixed-scope contract. No vague allowances, no surprise change orders.
On-site execution under a dedicated project manager, with weekly progress photos, a live schedule, and clear escalation paths for any decision.
Independent quality inspection, punch-list resolution, commissioning of systems, and a comprehensive walkthrough before handover.
Keys, drawings, manuals, warranties and a maintenance plan — plus a 12-month workmanship guarantee and ongoing support.
Transparent starting rates for project & cost control. Pick the tier that matches your ambition — every engagement is detailed to a line-item contract before work begins.
Move the sliders for a ballpark figure. Real estimates are line-item and based on a site visit — this is a planning indicator, not a quote.
Final pricing depends on site conditions, permits, material lead times and specification. Typical variance: ±15%.
Drag the slider to see a recent project & cost control outcome — raw site condition on the left, finished delivery on the right.


Recent projects with measurable outcomes from this discipline.

Twelve high-performance townhouses delivered as a single coordinated phased handover.

1,400 sqft gut-renovation with brass detailing, statement island and architectural lighting.
Verified reviews from project & cost control clients. Filter by what matters most to you.
"They delivered two full weeks ahead of schedule without cutting a single corner. The weekly reporting was gold."
"Transparent pricing from day one. No surprise change orders, no inflated allowances. Exactly what was promised."
"Their design coordination saved us from three expensive mistakes our architect hadn't caught. True craftsmen."
"Project manager was on-site daily and reachable nights and weekends. We never felt out of the loop."
"We compared four bids. Theirs wasn't the cheapest — but the line-item detail and inclusions made it the clear value."
"Snagging list at handover was eight items. Resolved in five days. Compare that to our last contractor — 140 items, six months."
"The 3D walkthrough before construction let us catch a lighting issue that would have cost a fortune to fix later."
"Their material specifications were so thorough our insurer reduced our premium. That's a first in twenty years."
"Weekly drone footage and a shared dashboard kept our overseas board fully informed. Best comms we've ever had."
"Crew respected the neighbours — clean site, quiet hours observed, no complaints across a nine-month build."
"They reworked the kitchen layout three times until it was right. No charge, no pushback. That's partnership."
"Came in 4% under budget on a £2.3M fit-out. Returned the underspend instead of finding ways to spend it."
"The detailing on the curved staircase is museum-grade. Every visitor stops to touch it."
"Phased occupation let us keep trading through the refurb — zero days of lost revenue. Exceptional planning."
"Their procurement team locked in steel prices a month before the spike. Saved us six figures, no fuss."
"The finish quality was beyond anything we'd seen on three previous builds. Every joint, every line — flawless."
"They delivered two full weeks ahead of schedule without cutting a single corner. The weekly reporting was gold."
"Transparent pricing from day one. No surprise change orders, no inflated allowances. Exactly what was promised."
"Their design coordination saved us from three expensive mistakes our architect hadn't caught. True craftsmen."
"Project manager was on-site daily and reachable nights and weekends. We never felt out of the loop."
A printable PDF with full scope, our six-stage process, indicative pricing structure and FAQs — formatted for sharing with your architect, partner or board.
Monthly hard-bound cost reports with weekly digital snapshots. Custom cadence for lender requirements.
Yes — every change order is reviewed for scope, price, schedule impact and entitlement. We typically reduce CO value by 8–15% via negotiation.
Full lender draw packages, monthly draw certificates and independent monitor coordination as required.
Cost control is then reported by a separate internal team with structural independence from delivery.
Executive summary + line-item detail + trend graphs + risk register. PDF + Excel. Custom formats for specific lender or investor requirements.
0.5–1.2% of construction cost; standalone or bundled with design management or delivery.