Meridian Corporate Tower
Eight-story HQ with performance curtain wall, rooftop garden and column-free floor plates.
New life for great bones.
Conversion of industrial, commercial or institutional buildings into compelling new uses.
Adaptive reuse is feasibility-heavy work — most existing-building conversions fail at the structural, MEP or code-compliance stage, not the design stage. We lead with a 4–6 week feasibility phase covering structural capacity, envelope condition, code path and pro-forma economics.
Past adaptive-reuse projects include industrial-to-residential lofts, warehouse-to-office conversions, and church-to-mixed-use transformations.




A clear, six-stage path from first conversation to handover — tailored for adaptive reuse.
We walk the site, listen to your goals and constraints, capture measurements, and align on a realistic budget envelope before any drawings are produced.
Architectural and structural detailing, material selection, and 3D coordination — refined with you until every decision is locked in writing.
Detailed line-item estimate, schedule of values and a transparent fixed-scope contract. No vague allowances, no surprise change orders.
On-site execution under a dedicated project manager, with weekly progress photos, a live schedule, and clear escalation paths for any decision.
Independent quality inspection, punch-list resolution, commissioning of systems, and a comprehensive walkthrough before handover.
Keys, drawings, manuals, warranties and a maintenance plan — plus a 12-month workmanship guarantee and ongoing support.
Transparent starting rates for adaptive reuse. Pick the tier that matches your ambition — every engagement is detailed to a line-item contract before work begins.
Move the sliders for a ballpark figure. Real estimates are line-item and based on a site visit — this is a planning indicator, not a quote.
Final pricing depends on site conditions, permits, material lead times and specification. Typical variance: ±15%.
Drag the slider to see a recent adaptive reuse outcome — raw site condition on the left, finished delivery on the right.


Recent projects with measurable outcomes from this discipline.

Eight-story HQ with performance curtain wall, rooftop garden and column-free floor plates.

6,200 sqft contemporary villa with full smart-home backbone and custom millwork throughout.
Verified reviews from adaptive reuse clients. Filter by what matters most to you.
"The detailing on the curved staircase is museum-grade. Every visitor stops to touch it."
"Phased occupation let us keep trading through the refurb — zero days of lost revenue. Exceptional planning."
"Their procurement team locked in steel prices a month before the spike. Saved us six figures, no fuss."
"The finish quality was beyond anything we'd seen on three previous builds. Every joint, every line — flawless."
"They delivered two full weeks ahead of schedule without cutting a single corner. The weekly reporting was gold."
"Transparent pricing from day one. No surprise change orders, no inflated allowances. Exactly what was promised."
"Their design coordination saved us from three expensive mistakes our architect hadn't caught. True craftsmen."
"Project manager was on-site daily and reachable nights and weekends. We never felt out of the loop."
"We compared four bids. Theirs wasn't the cheapest — but the line-item detail and inclusions made it the clear value."
"Snagging list at handover was eight items. Resolved in five days. Compare that to our last contractor — 140 items, six months."
"The 3D walkthrough before construction let us catch a lighting issue that would have cost a fortune to fix later."
"Their material specifications were so thorough our insurer reduced our premium. That's a first in twenty years."
"Weekly drone footage and a shared dashboard kept our overseas board fully informed. Best comms we've ever had."
"Crew respected the neighbours — clean site, quiet hours observed, no complaints across a nine-month build."
"They reworked the kitchen layout three times until it was right. No charge, no pushback. That's partnership."
"Came in 4% under budget on a £2.3M fit-out. Returned the underspend instead of finding ways to spend it."
"The detailing on the curved staircase is museum-grade. Every visitor stops to touch it."
"Phased occupation let us keep trading through the refurb — zero days of lost revenue. Exceptional planning."
"Their procurement team locked in steel prices a month before the spike. Saved us six figures, no fuss."
"The finish quality was beyond anything we'd seen on three previous builds. Every joint, every line — flawless."
A printable PDF with full scope, our six-stage process, indicative pricing structure and FAQs — formatted for sharing with your architect, partner or board.
Our feasibility phase covers structural capacity, envelope, MEP capacity, code path and economic viability — we go/no-go in 4–6 weeks.
Phase I and II environmental assessments are standard for any pre-1990 building; abatement plan integrated into the program.
Often yes, sometimes with targeted strengthening. We model the existing structure before any design commits.
12–28 months depending on scale, code path and existing-building condition.
Often 60–85% of equivalent new-build cost — but with site, character and approvals advantages that often justify the premium.
Yes — most adaptive-reuse projects achieve 50–70% energy reduction vs the original building via envelope, MEP and controls upgrades.